We provide free access to qualified tutors across the U.S.
Find the perfect tutor now!

In-Person Tutoring Online Tutoring
Search

ie: Algebra, Writing, Guitar...

ie: 33635 or Tampa, FL

andre b.

Back

Euless, TX 76040

Male ( Age 48 )

Member since:05/2015

Rates from $33 to $40

I can perfom tutoring:

  • On-line
  • In-home
  • Group

Will travel up to 20 miles

Additional Policies:

$2 fuel surcharge over 10 miles Cancellation without notice fee of $20 Materials not included in rate

Contact This Tutor

Provide details about your tutoring needs.

Subject

In-Person Tutoring Online Tutoring

Your Zip Code:

First Name

Last Name

Email

Confirm Email

Notify me of available tutors

I have read and agree to the Terms of Use

About Me

Experience Summary

1. 13 years of Experiences ,12 years in the power plant generation and construction industry and 1 years experience in tutor at vaal university of technology. 2. My resume 1. Eskom Senior Quality Engineer at Camden Power station(Dec 2012-March 2015) Power is generated by eight 200MW units with a total installed capacity on 1,600MW Coal Fired energy to electrical energy conversion efficiecy is 33.40% Area of Inspection: Turbine Auxiliary (Valves, piping and pressure vessels) Working with other Divisions/Units of the Inspection Department in developing new standard or improving/updating existing standards of the power plant. ? Attend to technical issues on centre line during machine assembling ? Review Quality plans before work commences ? Provide an engineering support service ? Provide a quality engineering service ? Development of scopes of work and input into planning process ? Provide a service engineering on outages ? Ensure the development and enhancement of service engineering skills ? Liaise closely with the customer turbine engineering representative and OEM representative ? Foster and maintain sound interdepartmental relationship between Outages and Engineering ? Ensure compliance with safety health environment and quality ? Review contractor specifications and quality documents ? Monitor installation and commissioning of components by outage contractors ? Attend outage meetings 2. Eskom ( Feb 2011 – Dec 2012) Senior quality Engineer Medupi Power Station Project When completed, the coal fired power station is to have six boilers each powering an 800 MW turbine, producing 4800 MW of power. It is expected to become the largest dry-cooled coal-fired power station in the world. The power station is currently expected to cost R170 Billion Reviewing and verifying submitted documents in accordance with design standards, criteria and conceptual design as stipulated in the Contract. Reviewing ITP’s coming from the contractors and send to the manager for the approval. Site inspection for all the sub-contractor fabricator verifying the work in accordance with the drawing. Prepare for the data pack. Prepare for the errection inspection work Analyze problem areas and recommend practical and cost effective solutions. • Prepare and Implement method statement in liaison with Client relevant Divisions and hired consultants to cover construction commissioning and operation activities. • Implement and enforce company Quality System and procedures to ensure operations are performed in an efficient manner in compliance with relevant legislation and company requirements. 3. Bureau Veritas Eskom kusile power station projects ( Jan 2008-Feb 2011) QA/QC Engineer Kusile is a coal-fired power station close to the existing Kendal Power Station in the Nkangala District of the Mpumalanga Province. The Kusile site is about 1 355 hectares in size, and is located on the Hartbeesfontein and Klipfontein farms. Kusile is the most advanced coal-fired power plant project in Eskom. As a rule, a coal-fired power station takes about ten years to build, but due to capacity constraints, the Kusile project has been fast-tracked and it is anticipated that it will take about eight years to complete. The station will consist of six units, each rated at approximately 800 MW installed capacity, giving a total of 4800 MW. As such it will be one of the largest coal-fired power stations in the world, once finished. The power station will be coal fired, with the coal supplied by Anglo Coal (New Largo and Zondagfontein collieries). The combination of the resources is expected to yield not less than 800 million sales tons over a period of not less than 47 years. Duties: Reviewing of detailed engineering design. Carry out daily inspection of the work to Eskom/Black & Veanch international specifications including structural foundations to steel errection, sign off on concrete pours. Attend contractors progress meetings- sign off on monthly construction progress claims. Reviewing and verifying submitted documents in accordance with design standards, criteria and conceptual design as stipulated in the Contract. Ensuring that the technical specifications have been duly accounted for in the documents submitted by the Contractor. Providing periodic status reports on the design and review activities as measured against the approved schedule; identify any problems and difficulties encountered Carrying out checks on the Contractors’ setting–out, and ensuring that the works are carried out in accordance to drawings and other design details Coordinating to Site Engineers, Supervisors, Sub-Contractors meeting about Construction scheme, issuance of plans and shop drawings, Safety measures implemented at jobsite. Ensuring that works are executed in accordance to the provisions of the contract, including those relating to standards of workmanship, safety requirements and environmental protection requirements Maintaining full and detailed permanent site records, including site correspondences, survey data, quality acceptance data, site diaries, measurement and certification, minutes of meetings and records of all other relevant matters Site meeting with contractor and reporting to resident site engineer, preparing daily reports and weekly reports. 4. PMT- British Gas Sfax Tunisia ( Apr 2005 – Nov 2007 ) Construction Engineer (North Africa) Over 4 years of field experience on oil and gas facilities/Infrastructure construction in varying supervisory capacities, from dredging of Oil well swamp location,Reclamation,Piping and modification and revamping of existing live facilities to EPC contracts participation. Construction of 16 (Including a cryogenic tank) Product/Process tanks with a capacity range of 1,500m cube to 46,000m cube of vary material range from carbon steel shells of 8mm to 45 mm and stainless steel shell plates of 15mm. Erection and fabrication of miscellaneous peripherals and roofs (Dome, Fixed cone and float DD). Responsibilities as a construction Engineer: Daily co-ordination supervision of construction works and interfacing with relevant team members(office and field), Monitor & Report progress while ensuring that the project is executed within schedule time despite delay/Slips. Maintain Supervisory leadership and guidance to attain optimum commercial productivity and target completions dates. Monitors construction activities in the field from the performance management perspective against contract requirements. 5.Lihir Gold ( Jul 2004 – March 2005) New guinee Construction superintendent LGL flotation project $160m – Gold mining construction PNG Scope of work held, not limited to: Performing preliminary inspection not only on the plan itself but went to the site location many times to ensure that the plan fits the location and vice versa. Preparing detailed construction methodology scopes Prepare detailed scoped planned risk analysis documents Responsible in preliminary inspection during execution of the project to insure quality control is maintained in all site activities at all time. Coordinating to the Client for some adjustment and revision of shop drawings and request for approval. 6. ARG Engineers ( Jan 2004 – Jun 2004 ) Mechanical piping supervisor Underground in hydraulics field (drilling and the trackless machinery and conveyor systems) Anglo gold: Testing of underground fan start up on generator supply for ABB Pipeline work and pipe jacking . 7.GCM mining ( Oct 1999 – Sept 2001 ) Junior construction superintendent( Part time ) Tulwezembe project DR congo Inspect and report on civil structural and mechanical aspects for the construction of the finucane is supply water line, including HDPE buried pipes lines, above ground cement lined pipes work with thrust blocks Prepare the tracking schedules for structural, mechanical and piping works EDUCATION University of south Africa South Africa Baccalareus Technologiae: Mechanical Engineering Vaal University of Technology Vanderbiljpark South Africa National Diploma: Mechanical Engineering ProductOne Centurion south Africa Certificate in Pro/engineer wildfire 4.0 College John XXIII Senior certificate matriculate (grade 12 higher standard)

Teaching Style

any but face to face better

My Hobbies

watching soccer, movies, reading mechanical engineering magazines and playing volley ball.

Other Comments

na

Credentials

Type Level Year Title Issued By
Degree Bachelors 2011 Mechanical engineering University of south Africa
Other National diploma 2007 Mechanical Engineering Vaal University of Technology

Subject Commentary

All Subjects I Tutor

  • Algebra
  • Algebra I
  • Algebra II
  • Algebra III
  • Calculus I
  • Calculus II
  • College Algebra
  • Mechanical Engineering
  • Pre-Algebra
  • Pre-Calculus
  • Trigonometry